Dudhkoshi-9 Hydropower Project
Salient Features
410 m
394.25 m
Design Discharge
(at 40.8 % PoE):
47.6 m3/s
Headrace Tunnel:
8580 m
Average Annual Energy:
956.65 GWh
Project Overview
Dudhkoshi – 9 HPP lies in the middle reaches of the Dudhkoshi River, which originates from the Himalayas. The project components are located at Solukhumbu District, Nepal between elevations of 2762 m and 2352 m above mean sea level, resulting in a gross head of about 410m. The Installed Capacity of the project is 166 MW utilizing a discharge of 47.60 m3/s. The feasibility study of the project has been completed. At present, approval procedure for conducting the Environmental Impact Assessment has been initiated.