Careers Apply
Apply Here
Fill out the form for job opportunities.
Urja Developers or simply, Urja, is a rising brand in the renewable energy sector. Driven by sustainability and ethical work values, Urja is growing as a holistic solution provider for the energy sector.
Located in the middle reach of Mai river in Ilam district of eastern part of Nepal, Mai Beni Hydropower Project is a Run-of-River type hydropower project with an installed capacity of 9.51 MW. The Project is the pilot project of Urja Developers Pvt. Ltd.
Lower Jogmai Khola Hydropower Project is a simple Run-of-River type hydropower project located in Ilam District of eastern Nepal. The project lies at the end reach of Jogmai River within close proximity of Mai Beni Hydropower Project, where the river meets the Mai river.
Located at a distance of 700 Km northeast of Kathmandu, Middle Mewa Hydropower project is one of the very few Peaking Run of River (PROR) type projects in Nepal. The project is proposed in Mewa river in the Taplejung District of eastern Nepal.
Located at a distance of 700 Km northeast of Kathmandu, Siwa Khola Hydropower Project is proposed in Siwa river in Taplejung District, Province-1 of eastern Nepal.
Located in the Myagdi District of Nepal, Myagdi Khola HPP is sited on Myagdi River in Gandaki Province, Nepal.
Located in the Myagdi District of Nepal, Myagdi Khola HPP is sited on Myagdi River in Gandaki Province, Nepal.
Dudhkoshi – 9 Hydropower Project lies in the middle reaches of the Dudhkoshi River, which originates from the Himalayas. The project components are located at Solukhumbu District, Nepal.
Fill out the form for job opportunities.