Tamakoshi-9 Hydropower Project

Project Detail

Project Name

Tamakoshi-9 Hydropower Project

Installed capacity

24.46 MW

Project Location

Bigu rural Municipality, Dolakha District, Province – 3

Type of Scheme:

Run-of-River (RoR)

Power Evacuation to:

Garjyang Substation (Approx. 45 km from Powerhouse)

Salient Features

Gross Head:

162 m

Net Rated Head:

153.9 m

Design Discharge:
20.25 m3/s
Net Annual Energy:

131.61 GWh

Project Overview

The project lies in the upper reaches of Tamakoshi river in Dolakha District of Nepal. The entire project components are located along the right bank of Tamakoshi River between elevation of 2165 m and 2000 m above mean sea level. The gross head of the project is 162 m, the design discharge is 20.25 m3/s and the installed capacity is 24.46 MW.

The project is within very short distance of about 170 km from the Kathmandu, the capital city of Nepal. At present, Feasibility Study of the project is completed and approval of Feasibility Study Report from Department of National Park and Wildlife Conservation is obtained.